Image - 2026-11-04 00:13
Edit the reference image. Keep EVERYTHING identical: the man, the machine, the footplate, the pose, the background, the lighting, the framing, the plates and the yellow pin. Change ONLY the weight stack gap: in the empty gap between the lifted top group of three plates and the lower plates, draw the missing parts so the raised plates are not floating: two vertical polished steel guide rods running straight through the gap on the left and right sides, continuing from the upper guide rods and passing through the holes of the lower plates, and one steel selector rod (the pin's lift rod) in the middle of the gap connecting the yellow pin plate down to the plate below it. All rods perfectly vertical, realistic metal, matching the existing rods above. No text, no logos, no watermark.
Free to start · Generate videos and images with AI in seconds